Minecraft PC IP: play.cubecraft.net

1Kekz

Member
Jul 27, 2025
14
46
14
Germany
youtube.com
Pronouns
He/Him
Currently, the teams are assigned one by one: first, one team gets full, then the next one, then the next one, and so on. In Single, Duo, and To4, this is not a big problem because most of the time, enough players are found to fill the lobby. But in Mega, it's usually one team of 10 and the other teams have way less players. Most of the time there's not even enough players to have a 4th team.

So the solution is simple: Instead of filling up each team individually, the teams should be assigned in a different order:

Player 1: Team 1
Player 2: Team 2
Player 3: Team 3
Player 4: Team 4
Player 5: Team 1
Player 6: Team 2
...and so on

That way, no team is severely undermanned.
 

Rabidsyllab

Well-Known Member
Jan 12, 2025
308
793
99
www.youtube.com
Pronouns
He/Him
Currently, the teams are assigned one by one: first, one team gets full, then the next one, then the next one, and so on. In Single, Duo, and To4, this is not a big problem because most of the time, enough players are found to fill the lobby. But in Mega, it's usually one team of 10 and the other teams have way less players. Most of the time there's not even enough players to have a 4th team.

So the solution is simple: Instead of filling up each team individually, the teams should be assigned in a different order:

Player 1: Team 1
Player 2: Team 2
Player 3: Team 3
Player 4: Team 4
Player 5: Team 1
Player 6: Team 2
...and so on

That way, no team is severely undermanned.
I like this but maybe only implement this in mega.
 
Members Online

Team online

Latest profile posts

Eli wrote on mevil72's profile.
Thank you for the follow!
Faizan908 wrote on Muhh's profile.
Tysm, my most amount of report is accepted by you lol
itz1anass wrote on Fesa's profile.
Best QA in the world!!
itz1anass wrote on Ahmdprogamer's profile.
Follow me😡
AliWarrior wrote on mrpeeveepee's profile.
Thanks for the follow!
Top Bottom